NW3

NW3 experienced different phases in which we have consulted the Developer and his Architect to optimise the site. In first instance the proposal was to convert the internal from commercial to residential. Following this two-additional storey and side extension were designed. Finally implementing a stepped rear extension.

Service Provided:

Pre-Acquisition Advice.

Initial Feasibility.

Site Optimisation.

Technical Analysis.

Daylight and Sunlight Assessment.

Assessment of the Proposed Development.

Full Rights of Light Report.

Strategic Advice and Negotiation.

W1

W1 is located in prime central London and consisted on an infill. The proposal was surrounding by commercial properties of high value which could have caused implication to the project if not resolved.

Service Provided:

Site Optimisation.

Technical Analysis.

Full Rights of Light Report.

Strategic Advice and Negotiation.

CM14

CM14 was the redevelopment of a villa with a contemporary addition to the rear. The site was restrictive and concerns were raised to the adequacy of the daylighting to the proposed development, in particular to the units which were to be converted, in the existing building. The proposal was surrounded by commercial properties.

Service Provided:

Technical Analysis.

Daylight and Sunlight Assessment.

Assessment of the Proposed Development.

Full Rights of Light Report.

NW3

NW3 experienced different phases in which we have consulted the Developer and his Architect to optimise the site. In first instance the proposal was to convert the internal from commercial to residential. Following this two-additional storey and side extension were designed. Finally implementing a stepped rear extension.

Service Provided:

Pre-Acquisition advice.

Initial feasibility.

Site optimisation.

Technical analysis.

Daylight and Sunlight assessment.

Assessment of the proposed development.

Full Rights of Light report.

Strategic advice and negotiation.

W1

W1 is located in prime central London and consisted on an infill. The proposal was surrounding by commercial properties of high value which could have caused implication to the project if not resolved.

Service Provided:

Site Optimisation.

Technical Analysis.

Full Rights of Light Report.

Strategic Advice and Negotiation.

CM14

CM14 was the redevelopment of a villa with a contemporary addition to the rear. The site was restrictive and concerns were raised to the adequacy of the daylighting to the proposed development, in particular to the units which were to be converted, in the existing building. The proposal was surrounded by commercial properties.

Service Provided:

Technical Analysis.

Daylight and Sunlight Assessment.

Assessment of the Proposed Development.

Full Rights of Light Report.

EC1

EC1 is a small commercial development. The development was to extend the rear to full height. It was surrounded by residential and commercial properties.

Service Provided:

Initial Feasibility.

Technical Analysis.

Design Cutbacks.

Daylight and Sunlight Assessment.

Full Rights of Light Report.

Strategic Advice and Negotiation.

SW12

SW12 was the redevelopment of an old villa and warehouse. The proposal was to demolish the rear warehouse and create new build to replace it. Further to this to new additions would be integrated either side.

Service Provided:

Initial Feasibility.

Site Optimisation.

Technical Analysis.

Design Cutbacks.

Daylight and Sunlight Assessment.

Assessment of the Proposed Development.

Full Rights of Light Report.

Disposal of property as selling agents.

RM1

RM1 consisted of the redevelopment of a site in Romford. The proposal was to provide in 200 homes. The development was surrounded by a number of properties and due to the scale and proximity would cause an impact.

Service Provided:

Initial Feasibility.

Technical Analysis.

Full Rights of Light Report.

Strategic Advice and Negotiation.

EC1

EC1 is a small commercial development. The development was to extend the rear to full height. It was surrounded by residential and commercial properties.

Service Provided:

Initial Feasibility.

Technical Analysis.

Design Cutbacks.

Daylight and Sunlight Assessment.

Full Rights of Light Report.

Strategic Advice and Negotiation.

SW12

SW12 was the redevelopment of an old villa and warehouse. The proposal was to demolish the rear warehouse and create new build to replace it. Further to this to new additions would be integrated either side.

Service Provided:

Initial Feasibility.

Site Optimisation.

Technical Analysis.

Design Cutbacks.

Daylight and Sunlight Assessment.

Assessment of the Proposed Development.

Full Rights of Light Report.

Disposal of property as selling agents.

RM1

RM1 consisted of the redevelopment of a site in Romford. The proposal was to provide in 200 homes. The development was surrounded by a number of properties and due to the scale and proximity would cause an impact.

Service Provided:

Initial Feasibility.

Technical Analysis.

Full Rights of Light Report.

Strategic Advice and Negotiation.

DA14

DA14 consisted of the demolition of the existing commercial and office blocks. The proposal was to develop the site into 42 residential units. The surrounding properties were a mix of residential and commercial. The scheme was also subject to consented schemes which required assessment.

Service Provided:

Technical Analysis.

Daylight and Sunlight Assessment.

Assessment of the Proposed Development.

NW8

NW8 was the development of a 19 storey and 10 storey mixed use scheme. It was to provide 190 flats and commercial on the ground floor. The surrounding area is a mix of residential and commercial.

Service Provided:

Site Optimisation.

Technical Analysis.

Design Cutbacks.

Daylight and Sunlight Assessment.

N2

N2 was the re-development of an office block and associated land which provided 80 flats. surrounding area is a mix of residential and commercial. The Architect asked for a massing study to be undertaken to ensure the levels of Daylighting and Sunlighting were not impacted. Finally the choose to design above the scheme and required further cutbacks.

Service Provided:

Site Optimisation.

Technical Analysis.

Design Cutbacks.

Daylight and Sunlight Assessment.

Assessment of the Proposed Development.

DA14

DA14 consisted of the demolition of the existing commercial and office blocks. The proposal was to develop the site into 42 residential units. The surrounding properties were a mix of residential and commercial. The scheme was also subject to consented schemes which required assessment.

Service Provided:

Technical Analysis.

Daylight and Sunlight Assessment.

Assessment of the Proposed Development.

NW8

NW8 was the development of a 19 storey and 10 storey mixed use scheme. It was to provide 190 flats and commercial on the ground floor. The surrounding area is a mix of residential and commercial.

Service Provided:

Site Optimisation.

Technical Analysis.

Design Cutbacks.

Daylight and Sunlight Assessment.

N2

N2 was the re-development of an office block and associated land which provided 80 flats. surrounding area is a mix of residential and commercial. The Architect asked for a massing study to be undertaken to ensure the levels of Daylighting and Sunlighting were not impacted. Finally the choose to design above the scheme and required further cutbacks.

Service Provided:

Site Optimisation.

Technical Analysis.

Design Cutbacks.

Daylight and Sunlight Assessment.

Assessment of the Proposed Development.

Enquire